The definitive guide to BS5837 Planning compliance. From initial Constraints Plans to Impact Assessments and site Supervision, we provide the technical data required to secure approval and satisfy Building Control.

Engineered for LPA Approval

  • Arboricultural Impact Assessment (AIA)

    We don't just list trees; we solve conflicts. Our AIA identifies exactly where development meets RPAs and provides the professional mitigation required for approval.

  • Discharging Planning Conditions

    Many projects stall at the 'Conditions' stage. Our Arboricultural Method Statements (AMS) are written to be "ready-to-discharge," preventing costly delays in starting on-site.

  • Satisfying Tree Officers

    With 20+ years of experience, we understand the specific nuances of South East Councils. We speak the technical language Tree Officers expect, reducing the need for costly revisions.

Technical Compliance

Our Planning Suite is strictly aligned with BS5837:2012 'Trees in relation to design, demolition and construction'. This ensures 100% validity for planning applications and mortgage security.

CPR Part 35 Compliant

The BS5837 Compliance Path

A structured approach is the only way to satisfy the Local Planning Authority (LPA) and Building Control.

01

Pre-Design

The Tree Constraints Plan (TCP) identifies the Root Protection Areas (RPAs) before the architect draws the site layout.

02

Submission

The Impact Assessment (AIA) evaluates the final design and provides the evidence for your planning application.

03

Pre-Start

The Method Statement (AMS) and Protection Plan (TPP) are submitted to discharge planning conditions.

04

Build Phase

On-site Supervision and Clerk of Works monitoring to secure final Building Control sign-off.

Pro Tip for Developers: Skipping Stage 01 (TCP) usually leads to redesigns and delays. Secure your constraints early to maximize developable space.

Planning Knowledge Base

Common questions regarding BS5837 compliance and council requirements.

How long is a BS5837 Tree Survey valid for?

Typically, a BS5837 Tree Survey is valid for 12 to 24 months. However, because trees are living organisms that grow and change, many Local Planning Authorities (LPAs) require a survey to be no older than one year to ensure the Constraints Plan is accurate.

Do I need an AIA or just a Tree Report?

If you are applying for planning permission where trees are present, you almost certainly need an Arboricultural Impact Assessment (AIA). While a standard report lists the trees, the AIA specifically explains to the Tree Officer how your build will co-exist with them without causing damage.

What is a Root Protection Area (RPA)?

The RPA is a layout tool used in BS5837 planning to define the minimum area around a tree deemed to contain sufficient roots to maintain its viability. Protecting the RPA is the single most important factor in securing planning approval where high-quality trees are involved.

Can I build within an RPA?

Yes, but it requires specialist engineering and a robust Arboricultural Method Statement (AMS). Solutions like "No-Dig" cellular confinement systems or pile-and-beam foundations allow for development while satisfying Building Control and tree safety requirements.

The BS5837:2012 Mandate

The British Standard 5837:2012 (Trees in relation to design, demolition and construction) is the mandatory technical framework for every planning application in the UK where trees are present. It provides a standardized process to ensure that development is sustainable and that the long-term health of the nation's tree canopy is protected.

Whether you are a homeowner extending a property or a commercial developer managing a multi-unit site, compliance with this standard is the primary hurdle for Local Planning Authority (LPA) validation.

The Four Pillars of Planning Approval

01. Design Integration

The Tree Constraints Plan (TCP) must be the first document created. It maps the Root Protection Areas (RPA) to ensure building footprints do not conflict with vital root systems.

02. Technical Evidence

The Arboricultural Impact Assessment (AIA) is the core of the submission. It provides the technical justification for your design, addressing every potential tree conflict.

03. Legal Safeguards

The Arboricultural Method Statement (AMS) details the exact construction techniques required to protect trees, often required to discharge planning conditions.

04. Professional Oversight

On-site Supervision ensures the Method Statement is followed, providing the necessary evidence for final Building Control sign-off.

The Technical Specifications

A compliant BS5837 Tree Report must contain specific data sets to be accepted by a Tree Officer. Our Planning Suite includes:

  • Tree Categorization: Grading trees from A (Highest Quality) to U (Remove) based on their condition and contribution to the landscape.
  • Accurate RPA Calculations: Precision mapping of the 'no-dig' zones based on stem diameter and species-specific growth patterns.
  • Shadow Footprints: Analysis of current and future shade to prevent future 'nuisance' claims and ensure daylight compliance.
  • Structural Integrity Soil Testing: Analysis of soil shrinkability to prevent future subsidence issues, a critical requirement for mortgage lenders.

Securing Building Control Sign-Off

Securing planning permission is only half the battle. To reach site completion, you must satisfy Building Control and discharge all arboricultural conditions. This requires a dedicated Tree Protection Plan (TPP) and consistent monitoring.

By utilizing our Expert Witness lead reports, your project is backed by data that is legally defensible, CPR Part 35 compliant, and engineered to withstand the highest levels of scrutiny at both local and national planning appeals.